PRJ.012025
Central AZ Manufacturer · Phoenix, AZ
15 kV Switchgear Replacement
Complete design and phased cutover of a legacy 15 kV medium-voltage switchgear lineup serving a 24/7 manufacturing operation. Included short-circuit and coordination study, arc flash re-analysis, and construction administration.
Power System DesignSKM StudyArc Flash
Case Study →
PRJ.022024
Confidential Tech Client · Chandler, AZ
Data Center Expansion — Phase II
Electrical design for a 4 MW expansion including redundant UPS, generator paralleling, and mission-critical distribution to a Tier-III equivalent standard.
Data CenterStandby Power
Case Study →
PRJ.032024
Regional Developer · Casa Grande, AZ
1.2 MW Rooftop Solar Array
PV interconnection design and utility coordination for a large commercial rooftop system, including inverter siting, DC/AC balance-of-system, and net-metering documentation.
Solar PVUtility Coordination
Case Study →
PRJ.042023
Healthcare Group · Tempe, AZ
Outpatient Surgical Center
Full electrical design for a new 32,000 SF outpatient surgical facility including essential electrical system per NEC 517, lighting, low-voltage systems, and generator sizing.
HealthcareLife Safety
Case Study →
PRJ.052023
Industrial Property Owner · Tucson, AZ
Warehouse & Cold Storage Retrofit
Service upgrade from 800 A to 2500 A to support refrigeration expansion and future EV charging. Included utility coordination with TEP and phased construction plan.
Service UpgradeIndustrial
Case Study →
PRJ.062022
Mixed-Use Developer · Scottsdale, AZ
Class-A Office Building
Ground-up electrical design for a 180,000 SF Class-A office including landlord/tenant separation, EV-ready infrastructure, and Title 24 compliant lighting controls.
CommercialGround-Up
Case Study →